• :::
  • Back to Home

  • 中

  • A

  • RSS

Default Logo

  • About RB
    • About RB
      • Director General of RB
      • Organizational Outline of the Railway Bureau
      • Quality policy
      • ISO Area
    • Affiliated Units
      • Northern Engineering
      • Central Engineering
      • Southern Engineering
      • Eastern Engineering
  • Railway Construction
    • Project Management
      • Progress of Projects
    • en-路網建設
      • Double-track Electrification of Railways in Hualien-Taitung Area
      • South Pingtung Tourist Railway Project
      • Airport MRT Extension Line Project
      • Keelung MRT
      • Airport MRT Adding Airport Terminal 3 Station (A14) Project
    • en-鐵路立體化建設
      • Tainan Urban District Railway Underground Project
      • Taiwan Railway Pingzhen Temporary Station Construction Project
      • Taoyuan Metropolitan Area Railway Underground Project
      • Elevated Railway Project at the Urban Area of Chiayi
      • Kaohsiung Urban Railway Underground Project (included Zuoying and Fengshan Project)
      • Taiwan Railway Station Aesthetics and Functional Improvement Project – South Link Station
    • en-已完成
      • Taiwan Railway Fengming Temporary Station Construction Project
      • Taichung Metropolitan Area Elevated Railway Project
      • South-Link Line Railway Electrification Project
      • Hualien-Taitung Line Electrification Project
      • Hualien-Taitung Line Efficiency Improvement Project
      • Taichung Metropolitan MRT System Wuri-Wenxin-Beitun Line Construction Project
      • Access Road to HSR Station Area Project
      • HSR Project
      • Taiwan Taoyuan International Airport Access MRT System Construction Project
  • Railway Business
    • Technology Zone
      • High-Speed Rail Electromechanical System
      • Airport Access MRT System
      • Taiwan Railway System Electromechanical Subsystems
      • Technical Documents
    • Project Management
      • Quality Assurance
      • Occupational Safety and Health
    • Operation Supervision
      • Supervision regulations
      • Operation
      • Safety
      • Inspection
      • Investigation
    • Railway Industry
      • Industry Policies
      • Action Plan
      • Industry Development Subsidy
      • Important Activities and Achievements
      • Contact Information
      • Railway Designated product area
    • Station Development
      • Taiwan High Speed Rail
      • Taoyuan Airport MRT
      • Investment Services
  • Publications
    • Multimedia
    • Newsroom
    • Major Policies
    • Public Information
      • Award Information
      • Awards Area
    • Laws and Regulations
    • Integrity Platform
      • Launching Ceremony
      • Contact Meeting
    • Gender Mainstreaming
  • Service
    • Downloads
      • ISO File Download
    • Employee Services
    • Online Application
      • High-Speed Rail Corridor Cable Trays
      • High-Speed Rail Station External Pre-embedded Pipelines
      • Taiwan Fiber-optic Cable Corridor
  • en-範例
    • en-子選單
      • en-單一文章
      • en-文章列表
      • en-頁籤
      • en-計畫列表
      • en-台灣地圖-圖片
      • en-台灣地圖-MAP
      • en-檔案下載-通用
      • en-檔案下載-法令
      • en-線上申辦
      • en-電子書
:::
Home
Sitemap

  

Sitemap


sitemap html

1 About RB
  • 1.1 About RB
  • 1.1.1 Director General of RB
  • 1.1.2 Organizational Outline of the Railway Bureau
  • 1.1.3 Quality policy
  • 1.1.4 ISO Area
  • 1.2 Affiliated Units
  • 1.2.1 Northern Engineering 
  • 1.2.2 Central Engineering 
  • 1.2.3 Southern Engineering 
  • 1.2.4 Eastern Engineering 
2 Railway Construction
  • 2.1 Project Management
  • 2.1.1 Progress of Projects
  • 2.2 en-路網建設
  • 2.2.1 Double-track Electrification of Railways in Hualien-Taitung Area
  • 2.2.2 South Pingtung Tourist Railway Project
  • 2.2.3 Airport MRT Extension Line Project
  • 2.2.4 Keelung MRT
  • 2.2.5 Airport MRT Adding Airport Terminal 3 Station (A14) Project
  • 2.3 en-鐵路立體化建設
  • 2.3.1 Tainan Urban District Railway Underground Project
  • 2.3.2 Taiwan Railway Pingzhen Temporary Station Construction Project
  • 2.3.3 Taoyuan Metropolitan Area Railway Underground Project
  • 2.3.4 Elevated Railway Project at the Urban Area of Chiayi
  • 2.3.5 Kaohsiung Urban Railway Underground Project (included Zuoying and Fengshan Project)
  • 2.3.6 Taiwan Railway Station Aesthetics and Functional Improvement Project – South Link Station
  • 2.4 en-已完成
  • 2.4.1 Taiwan Railway Fengming Temporary Station Construction Project
  • 2.4.2 Taichung Metropolitan Area Elevated Railway Project
  • 2.4.3 South-Link Line Railway Electrification Project
  • 2.4.4 Hualien-Taitung Line Electrification Project
  • 2.4.5 Hualien-Taitung Line Efficiency Improvement Project
  • 2.4.6 Taichung Metropolitan MRT System Wuri-Wenxin-Beitun Line Construction Project
  • 2.4.7 Access Road to HSR Station Area Project
  • 2.4.8 HSR Project
  • 2.4.9 Taiwan Taoyuan International Airport Access MRT System Construction Project
3 Railway Business
  • 3.1 Technology Zone
  • 3.1.1 High-Speed Rail Electromechanical System
  • 3.1.2 Airport Access MRT System
  • 3.1.3 Taiwan Railway System Electromechanical Subsystems
  • 3.1.4 Technical Documents
  • 3.2 Project Management
  • 3.2.1 Quality Assurance
  • 3.2.2 Occupational Safety and Health
  • 3.3 Operation Supervision
  • 3.3.1 Supervision regulations
  • 3.3.2 Operation
  • 3.3.3 Safety
  • 3.3.4 Inspection
  • 3.3.5 Investigation
  • 3.4 Railway Industry
  • 3.4.1 Industry Policies
  • 3.4.2 Action Plan
  • 3.4.3 Industry Development Subsidy
  • 3.4.4 Important Activities and Achievements
  • 3.4.5 Contact Information
  • 3.4.6 Railway Designated product area
  • 3.5 Station Development
  • 3.5.1 Taiwan High Speed Rail
  • 3.5.2 Taoyuan Airport MRT
  • 3.5.3 Investment Services
4 Publications
  • 4.1 Multimedia
  • 4.2 Newsroom
  • 4.3 Major Policies
  • 4.4 Public Information
  • 4.4.1 Award Information
  • 4.4.2 Awards Area
  • 4.5 Laws and Regulations
  • 4.6 Integrity Platform
  • 4.6.1 Launching Ceremony
  • 4.6.2 Contact Meeting
  • 4.7 Gender Mainstreaming
5 Service
  • 5.1 Downloads
  • 5.1.1 ISO File Download
  • 5.2 Employee Services
  • 5.3 Online Application
  • 5.3.1 High-Speed Rail Corridor Cable Trays
  • 5.3.2 High-Speed Rail Station External Pre-embedded Pipelines
  • 5.3.3 Taiwan Fiber-optic Cable Corridor
6 en-範例
  • 6.1 en-子選單
  • 6.1.1 en-單一文章
  • 6.1.2 en-文章列表
  • 6.1.3 en-頁籤
  • 6.1.4 en-計畫列表
  • 6.1.5 en-台灣地圖-圖片
  • 6.1.6 en-台灣地圖-MAP
  • 6.1.7 en-檔案下載-通用
  • 6.1.8 en-檔案下載-法令
  • 6.1.9 en-線上申辦
  • 6.1.10 en-電子書
:::
  • About RB
    • About RB
    • Affiliated Units
  • Railway Construction
    • Project Management
    • en-路網建設
    • en-鐵路立體化建設
    • en-已完成
  • Railway Business
    • Technology Zone
    • Project Management
    • Operation Supervision
    • Railway Industry
    • Station Development
  • Publications
    • Multimedia
    • Newsroom
    • Major Policies
    • Public Information
    • Laws and Regulations
    • Integrity Platform
    • Gender Mainstreaming
  • Service
    • Downloads
    • Employee Services
    • Online Application
  • en-範例
    • en-子選單
  • Privacy Policy  |
  • Information Security Policy  |
  • Open Announcement
logo

Emergency Contact: During Office Hours: (02)8072-3333 | After Hours or Holidays: (02)8969-1601 Railway Bureau, MOTC All Rights Reserved | Tel: (02)8072-3333 | Fax: (02)8969-1567 Address: 9F., No.7, Sec. 2, Xianmin Blvd., Banqiao Dist., New Taipei City 220231, Taiwan (R.O.C.)

Ethics Hotline: (02)8969-1540 | Ethics Fax: (02)8969-1539 Ethics Mailbox: New Taipei City Government Post Office Box 18 Ethics Email: invx@rb.gov.tw Recommended browsers: Chrome, Edge, Safari, Firefox. Screen resolution: 1280 X 810 or higher.

logo