  • Back to Home

  • 中

  • A

  • RSS

Default Logo

  • About RB
    • About RB
      • Director General of RB
      • Organizational Outline of the Railway Bureau
      • Quality policy
      • ISO Area
    • Affiliated Units
      • Northern Engineering
      • Central Engineering
      • Southern Engineering
      • Eastern Engineering
  • Railway Construction
    • Project Management
      • Progress of Projects
    • en-路網建設
      • Double-track Electrification of Railways in Hualien-Taitung Area
      • South Pingtung Tourist Railway Project
      • Airport MRT Extension Line Project
      • Keelung MRT
      • Airport MRT Adding Airport Terminal 3 Station (A14) Project
    • en-鐵路立體化建設
      • Tainan Urban District Railway Underground Project
      • Taiwan Railway Pingzhen Temporary Station Construction Project
      • Taoyuan Metropolitan Area Railway Underground Project
      • Elevated Railway Project at the Urban Area of Chiayi
      • Kaohsiung Urban Railway Underground Project (included Zuoying and Fengshan Project)
      • Taiwan Railway Station Aesthetics and Functional Improvement Project – South Link Station
    • en-已完成
      • Taiwan Railway Fengming Temporary Station Construction Project
      • Taichung Metropolitan Area Elevated Railway Project
      • South-Link Line Railway Electrification Project
      • Hualien-Taitung Line Electrification Project
      • Hualien-Taitung Line Efficiency Improvement Project
      • Taichung Metropolitan MRT System Wuri-Wenxin-Beitun Line Construction Project
      • Access Road to HSR Station Area Project
      • HSR Project
      • Taiwan Taoyuan International Airport Access MRT System Construction Project
  • Railway Business
    • Technology Zone
      • High-Speed Rail Electromechanical System
      • Airport Access MRT System
      • Taiwan Railway System Electromechanical Subsystems
      • Technical Documents
    • Project Management
      • Quality Assurance
      • Occupational Safety and Health
    • Operation Supervision
      • Supervision regulations
      • Operation
      • Safety
      • Inspection
      • Investigation
    • Railway Industry
      • Industry Policies
      • Action Plan
      • Industry Development Subsidy
      • Important Activities and Achievements
      • Contact Information
      • Railway Designated product area
    • Station Development
      • Taiwan High Speed Rail
      • Taoyuan Airport MRT
      • Investment Services
  • Publications
    • Multimedia
    • Newsroom
    • Major Policies
    • Public Information
      • Award Information
      • Awards Area
    • Laws and Regulations
    • Integrity Platform
      • Launching Ceremony
      • Contact Meeting
    • Gender Mainstreaming
  • Service
    • Downloads
      • ISO File Download
    • Employee Services
    • Online Application
      • High-Speed Rail Corridor Cable Trays
      • High-Speed Rail Station External Pre-embedded Pipelines
      • Taiwan Fiber-optic Cable Corridor
  • en-範例
    • en-子選單
      • en-單一文章
      • en-文章列表
      • en-頁籤
      • en-計畫列表
      • en-台灣地圖-圖片
      • en-台灣地圖-MAP
      • en-檔案下載-通用
      • en-檔案下載-法令
      • en-線上申辦
      • en-電子書
:::
Home
Railway Construction
en-已完成
Hualien-Taitung Line Electrification Project

  

Hualien-Taitung Line Electrification Project


4 Phases of Construction
1. Study
2. Design
3. Construction
4. Completion
Plan Status

Planned
20%

Actual
30%

Progress
+10%

Go toCurrent statusCurrent
4. Completion
無內容
View more>>
3. Construction
無內容
View more>>
2. Design
無內容
View more>>
1. Study
無內容
View more>>
Plan Introduction


Summary:

The Executive Yuan approved the Hualien-Taitung Line Electrification Project on March 13, 2008 for the purpose of upgrading railway services in eastern Taiwan and thus further promoting the tourism industry there. Not only completing a modern railway network round the island, it is also meant to accommodate fast-growing demand for rapid transport in this part of the island. Spanning about 166.1 kilometers from Hualien Station to Zhiben Station in Taitung, the project will electrify the entire route, lay double tracks in the bottleneck sections, and build four double-track tunnels and three bridges. Duration to the project is from 2008 to 2018. The total cost of this project is NT$25.43 billion. This Project was opened for operation on June 28, 2014.

 

Performance:

The viaduct station of Shoufeng and the section from Shoufeng to Nanping for the project was opened for operation on Aug 26 and Oct 20, 2015 separately. The new Ziqiang Tunnel has been drilled through on Oct. 20, 2015.

 

The schematic diagram of Hualien-Taitung Line Electrification Project

 

Summary:

The Executive Yuan approved the Hualien-Taitung Line Electrification Project on March 13, 2008 for the purpose of upgrading railway services in eastern Taiwan and thus further promoting the tourism industry there. Not only completing a modern railway network round the island, it is also meant to accommodate fast-growing demand for rapid transport in this part of the island. Spanning about 166.1 kilometers from Hualien Station to Zhiben Station in Taitung, the project will electrify the entire route, lay double tracks in the bottleneck sections, and build four double-track tunnels and three bridges. Duration to the project is from 2008 to 2018. The total cost of this project is NT$25.43 billion. This Project was opened for operation on June 28, 2014.

 

Performance:

The viaduct station of Shoufeng and the section from Shoufeng to Nanping for the project was opened for operation on Aug 26 and Oct 20, 2015 separately. The new Ziqiang Tunnel has been drilled through on Oct. 20, 2015.

 

The schematic diagram of Hualien-Taitung Line Electrification Project

 

:::
  • About RB
    • About RB
    • Affiliated Units
  • Railway Construction
    • Project Management
    • en-路網建設
    • en-鐵路立體化建設
    • en-已完成
  • Railway Business
    • Technology Zone
    • Project Management
    • Operation Supervision
    • Railway Industry
    • Station Development
  • Publications
    • Multimedia
    • Newsroom
    • Major Policies
    • Public Information
    • Laws and Regulations
    • Integrity Platform
    • Gender Mainstreaming
  • Service
    • Downloads
    • Employee Services
    • Online Application
  • en-範例
    • en-子選單
  • Privacy Policy  |
  • Information Security Policy  |
  • Open Announcement
logo

Emergency Contact: During Office Hours: (02)8072-3333 | After Hours or Holidays: (02)8969-1601 Railway Bureau, MOTC All Rights Reserved | Tel: (02)8072-3333 | Fax: (02)8969-1567 Address: 9F., No.7, Sec. 2, Xianmin Blvd., Banqiao Dist., New Taipei City 220231, Taiwan (R.O.C.)

Ethics Hotline: (02)8969-1540 | Ethics Fax: (02)8969-1539 Ethics Mailbox: New Taipei City Government Post Office Box 18 Ethics Email: invx@rb.gov.tw Recommended browsers: Chrome, Edge, Safari, Firefox. Screen resolution: 1280 X 810 or higher.

logo