A.Project Origin
Construction of an around-the-island electrification railway network is a fixed policy of Taiwan. Sections that are currently not electrified include the South-link line and the Pingtung line from Chaozhou to Fangliao, which is the last mile of the around-the-island electrification railway network. Railway Bureau, MOTC was instructed by the Executive Yuan to give priority to the completion of the electrification network and the strengthening of railroad safety, and gradually construct the vision of a one-day social circle across the island. The Executive Yuan approved the South-Link Line Railway Electrification Project on June 3, 2013.
B.Project Content
The total length of this construction project amounts to 123.4km, from Chaozhou Station in Pingtung County in the west to Taitung Station in Taitung County in the east. The engineering content of this project comprises the electrification of original lines, as well as the improvement of railway bridges and culverts, tunnels, slope protections, train stations, level crossings and electrical and mechanical equipment along the line. The project duration is from July, 2013 to March, 2022 and the total cost is NT27.61 billion.
C.Project Goal
D.Project Completed
All construction work was completed in March 2022.
A.Project Origin
Construction of an around-the-island electrification railway network is a fixed policy of Taiwan. Sections that are currently not electrified include the South-link line and the Pingtung line from Chaozhou to Fangliao, which is the last mile of the around-the-island electrification railway network. Railway Bureau, MOTC was instructed by the Executive Yuan to give priority to the completion of the electrification network and the strengthening of railroad safety, and gradually construct the vision of a one-day social circle across the island. The Executive Yuan approved the South-Link Line Railway Electrification Project on June 3, 2013.
B.Project Content
The total length of this construction project amounts to 123.4km, from Chaozhou Station in Pingtung County in the west to Taitung Station in Taitung County in the east. The engineering content of this project comprises the electrification of original lines, as well as the improvement of railway bridges and culverts, tunnels, slope protections, train stations, level crossings and electrical and mechanical equipment along the line. The project duration is from July, 2013 to March, 2022 and the total cost is NT27.61 billion.
C.Project Goal
D.Project Completed
All construction work was completed in March 2022.