  • Back to Home

  • 中

  • A

  • RSS

Default Logo

  • About RB
    • About RB
      • Director General of RB
      • Organizational Outline of the Railway Bureau
      • Quality policy
      • ISO Area
    • Affiliated Units
      • Northern Engineering
      • Central Engineering
      • Southern Engineering
      • Eastern Engineering
  • Railway Construction
    • Project Management
      • Progress of Projects
    • en-路網建設
      • Double-track Electrification of Railways in Hualien-Taitung Area
      • South Pingtung Tourist Railway Project
      • Airport MRT Extension Line Project
      • Keelung MRT
      • Airport MRT Adding Airport Terminal 3 Station (A14) Project
    • en-鐵路立體化建設
      • Tainan Urban District Railway Underground Project
      • Taiwan Railway Pingzhen Temporary Station Construction Project
      • Taoyuan Metropolitan Area Railway Underground Project
      • Elevated Railway Project at the Urban Area of Chiayi
      • Kaohsiung Urban Railway Underground Project (included Zuoying and Fengshan Project)
      • Taiwan Railway Station Aesthetics and Functional Improvement Project – South Link Station
    • en-已完成
      • Taiwan Railway Fengming Temporary Station Construction Project
      • Taichung Metropolitan Area Elevated Railway Project
      • South-Link Line Railway Electrification Project
      • Hualien-Taitung Line Electrification Project
      • Hualien-Taitung Line Efficiency Improvement Project
      • Taichung Metropolitan MRT System Wuri-Wenxin-Beitun Line Construction Project
      • Access Road to HSR Station Area Project
      • HSR Project
      • Taiwan Taoyuan International Airport Access MRT System Construction Project
  • Railway Business
    • Technology Zone
      • High-Speed Rail Electromechanical System
      • Airport Access MRT System
      • Taiwan Railway System Electromechanical Subsystems
      • Technical Documents
    • Project Management
      • Quality Assurance
      • Occupational Safety and Health
    • Operation Supervision
      • Supervision regulations
      • Operation
      • Safety
      • Inspection
      • Investigation
    • Railway Industry
      • Industry Policies
      • Action Plan
      • Industry Development Subsidy
      • Important Activities and Achievements
      • Contact Information
      • Railway Designated product area
    • Station Development
      • Taiwan High Speed Rail
      • Taoyuan Airport MRT
      • Investment Services
  • Publications
    • Multimedia
    • Newsroom
    • Major Policies
    • Public Information
      • Award Information
      • Awards Area
    • Laws and Regulations
    • Integrity Platform
      • Launching Ceremony
      • Contact Meeting
    • Gender Mainstreaming
  • Service
    • Downloads
      • ISO File Download
    • Employee Services
    • Online Application
      • High-Speed Rail Corridor Cable Trays
      • High-Speed Rail Station External Pre-embedded Pipelines
      • Taiwan Fiber-optic Cable Corridor
  • en-範例
    • en-子選單
      • en-單一文章
      • en-文章列表
      • en-頁籤
      • en-計畫列表
      • en-台灣地圖-圖片
      • en-台灣地圖-MAP
      • en-檔案下載-通用
      • en-檔案下載-法令
      • en-線上申辦
      • en-電子書
:::
Home
Railway Construction
en-已完成
Taichung Metropolitan Area Elevated Railway Project

  

Taichung Metropolitan Area Elevated Railway Project


4 Phases of Construction
1. Study
2. Design
3. Construction
4. Completion
Plan Status

Planned
1%

Actual
90%

Progress
+89%

Go toCurrent statusCurrent
4. Completion
無內容
View more>>
3. Construction
無內容
View more>>
2. Design
無內容
View more>>
1. Study
無內容
View more>>
Plan Introduction


 

Summary:

The Executive Yuan approved the Taichung Metropolitan Area Elevation Railway Project on February 13, 2006 to accommodate the TRA structural transformation. The project is also meant to facilitate urban renewal in areas near the original Taichung and Fengyuan stations, consolidate the regional metropolitan transport networks, and remove the impediment to regional development posed by rail tracks. Spanning a total of 21.7 kilometers, the Taichung Project begins north of Fengyuan Station, runs past Taichung Station, and extends to south of Daqing Station. A highlight is that the original Taichung Station will be preserved as a historical site. With the entire length elevated, a total of 17 level crossings were eliminated. On top of the viaducts of five stations—Fengyuan, Tanzi, Taiyuan, Taichung and Daqing, another five  were designed for commuters: Lilin, Toujiacuo, Songzhu, Jingwu and Wuquan. Duration to the project is from Februany, 2006 to june , 2020, and the total cost is NT$31.05 billion. After completion, the project is expected to help facilitate metropolitan transportation by easing traffic congestion and balance urban development by removing barriers (rail tracks) along the route. An improved cityscape that thus results certainly goes a long way toward raising the quality of living and environment; and the more efficient use of land will surely help foster economic growth. 

 

Performance:

Firstly, Fengyuan, Tanzi, Taiyuan, Taichung and Daqing elevate stations of the first stage of the project were open for operation on October 16, 2016. Secondly, Lilin, Toujiacuo, Songzhu, jingwu and Wuquan added commuter stations were also open on October 28, 2018. The project was scheduled for completion in June 2020.

 

 

The schematic diagram of Tainan Metropolitan Area Elevated Railway Project

 

Summary:

The Executive Yuan approved the Taichung Metropolitan Area Elevation Railway Project on February 13, 2006 to accommodate the TRA structural transformation. The project is also meant to facilitate urban renewal in areas near the original Taichung and Fengyuan stations, consolidate the regional metropolitan transport networks, and remove the impediment to regional development posed by rail tracks. Spanning a total of 21.7 kilometers, the Taichung Project begins north of Fengyuan Station, runs past Taichung Station, and extends to south of Daqing Station. A highlight is that the original Taichung Station will be preserved as a historical site. With the entire length elevated, a total of 17 level crossings were eliminated. On top of the viaducts of five stations—Fengyuan, Tanzi, Taiyuan, Taichung and Daqing, another five  were designed for commuters: Lilin, Toujiacuo, Songzhu, Jingwu and Wuquan. Duration to the project is from Februany, 2006 to june , 2020, and the total cost is NT$31.05 billion. After completion, the project is expected to help facilitate metropolitan transportation by easing traffic congestion and balance urban development by removing barriers (rail tracks) along the route. An improved cityscape that thus results certainly goes a long way toward raising the quality of living and environment; and the more efficient use of land will surely help foster economic growth. 

 

Performance:

Firstly, Fengyuan, Tanzi, Taiyuan, Taichung and Daqing elevate stations of the first stage of the project were open for operation on October 16, 2016. Secondly, Lilin, Toujiacuo, Songzhu, jingwu and Wuquan added commuter stations were also open on October 28, 2018. The project was scheduled for completion in June 2020.

 

 

The schematic diagram of Tainan Metropolitan Area Elevated Railway Project

:::
  • About RB
    • About RB
    • Affiliated Units
  • Railway Construction
    • Project Management
    • en-路網建設
    • en-鐵路立體化建設
    • en-已完成
  • Railway Business
    • Technology Zone
    • Project Management
    • Operation Supervision
    • Railway Industry
    • Station Development
  • Publications
    • Multimedia
    • Newsroom
    • Major Policies
    • Public Information
    • Laws and Regulations
    • Integrity Platform
    • Gender Mainstreaming
  • Service
    • Downloads
    • Employee Services
    • Online Application
  • en-範例
    • en-子選單
  • Privacy Policy  |
  • Information Security Policy  |
  • Open Announcement
logo

Emergency Contact: During Office Hours: (02)8072-3333 | After Hours or Holidays: (02)8969-1601 Railway Bureau, MOTC All Rights Reserved | Tel: (02)8072-3333 | Fax: (02)8969-1567 Address: 9F., No.7, Sec. 2, Xianmin Blvd., Banqiao Dist., New Taipei City 220231, Taiwan (R.O.C.)

Ethics Hotline: (02)8969-1540 | Ethics Fax: (02)8969-1539 Ethics Mailbox: New Taipei City Government Post Office Box 18 Ethics Email: invx@rb.gov.tw Recommended browsers: Chrome, Edge, Safari, Firefox. Screen resolution: 1280 X 810 or higher.

logo