  • Back to Home

  • 中

  • A

  • RSS

Default Logo

  • About RB
    • About RB
      • Director General of RB
      • Organizational Outline of the Railway Bureau
      • Quality policy
      • ISO Area
    • Affiliated Units
      • Northern Engineering
      • Central Engineering
      • Southern Engineering
      • Eastern Engineering
  • Railway Construction
    • Project Management
      • Progress of Projects
    • en-路網建設
      • Double-track Electrification of Railways in Hualien-Taitung Area
      • South Pingtung Tourist Railway Project
      • Airport MRT Extension Line Project
      • Keelung MRT
      • Airport MRT Adding Airport Terminal 3 Station (A14) Project
    • en-鐵路立體化建設
      • Tainan Urban District Railway Underground Project
      • Taiwan Railway Pingzhen Temporary Station Construction Project
      • Taoyuan Metropolitan Area Railway Underground Project
      • Elevated Railway Project at the Urban Area of Chiayi
      • Kaohsiung Urban Railway Underground Project (included Zuoying and Fengshan Project)
      • Taiwan Railway Station Aesthetics and Functional Improvement Project – South Link Station
    • en-已完成
      • Taiwan Railway Fengming Temporary Station Construction Project
      • Taichung Metropolitan Area Elevated Railway Project
      • South-Link Line Railway Electrification Project
      • Hualien-Taitung Line Electrification Project
      • Hualien-Taitung Line Efficiency Improvement Project
      • Taichung Metropolitan MRT System Wuri-Wenxin-Beitun Line Construction Project
      • Access Road to HSR Station Area Project
      • HSR Project
      • Taiwan Taoyuan International Airport Access MRT System Construction Project
  • Railway Business
    • Technology Zone
      • High-Speed Rail Electromechanical System
      • Airport Access MRT System
      • Taiwan Railway System Electromechanical Subsystems
      • Technical Documents
    • Project Management
      • Quality Assurance
      • Occupational Safety and Health
    • Operation Supervision
      • Supervision regulations
      • Operation
      • Safety
      • Inspection
      • Investigation
    • Railway Industry
      • Industry Policies
      • Action Plan
      • Industry Development Subsidy
      • Important Activities and Achievements
      • Contact Information
      • Railway Designated product area
    • Station Development
      • Taiwan High Speed Rail
      • Taoyuan Airport MRT
      • Investment Services
  • Publications
    • Multimedia
    • Newsroom
    • Major Policies
    • Public Information
      • Award Information
      • Awards Area
    • Laws and Regulations
    • Integrity Platform
      • Launching Ceremony
      • Contact Meeting
    • Gender Mainstreaming
  • Service
    • Downloads
      • ISO File Download
    • Employee Services
    • Online Application
      • High-Speed Rail Corridor Cable Trays
      • High-Speed Rail Station External Pre-embedded Pipelines
      • Taiwan Fiber-optic Cable Corridor
  • en-範例
    • en-子選單
      • en-單一文章
      • en-文章列表
      • en-頁籤
      • en-計畫列表
      • en-台灣地圖-圖片
      • en-台灣地圖-MAP
      • en-檔案下載-通用
      • en-檔案下載-法令
      • en-線上申辦
      • en-電子書
:::
Home
Railway Construction
en-已完成
Taiwan Railway Fengming Temporary Station Construction Project

  

Taiwan Railway Fengming Temporary Station Construction Project


4 Phases of Construction
1. Study
2. Design
3. Construction
4. Completion
Plan Status

Planned
100%

Actual
100%

Progress
0%

Go toCurrent statusCurrent
4. Completion
無內容
View more>>
3. Construction
無內容
View more>>
2. Design
無內容
View more>>
1. Study
無內容
View more>>
Plan Introduction


The origin of the project

  • In order to solve the commuter transportation needs in the metropolitan area, the Ministry of Transportation and Communications instructed the Taiwan Railway Administration to promote the "Taiwan Railway Rapid Transit Systematization". Through the Taiwan Railway's policies such as adding commuter stations and opening commuter trains along the route, it will improve access to mass transit services in metropolitan areas and their surrounding towns. Afterwards, in response to the opening of the high-speed rail, in order to transform the operation mode of the Taiwan Railway and relieve the transfer needs of high-speed rail passengers, and considering that local governments also hope that all metropolitan areas and their surrounding towns can enjoy metropolitan rail transportation services with MRT functions. In July 2003, Taiwan Railway Administration put forward the Evaluation Plan for Taiwan Railways to have MRT functions and to add commuter stations in metropolitan areas. The Fengming Station (North Taoyuan Station) will be merged into the "bottleneck section improvement project" and "addition of simple commuter stations project".
  • After the Executive Yuan held the Feasibility Study and Discussion on Taiwan Railway Adding Fengming Temporary Station meeting on July 23, 2019. Under the conditions of not affecting the future Taoyuan Railway underground project, and not acquiring more land or demolishing more buildings, the project to build a new Fengming temporary station is approved to meet the needs of the public.

 

Project outline

  • Project period: October 2019 to December 2024.【Completed】
  • Project scope: The starting point of the route is about 53K+700, the end point is about 54K+620, and the scheduled mileage of the platform center is about 54K+230.
  • Construction content: Unmanned station is adopted with two side platforms that is 3m in width and 220m in length. Moreover, the rain shelter facilities are added.
  • Program funding: NT$612.68 million.
  • Project location: New Taipei City.
  • Project schematic diagram: (The source of the screenshot is the approved version of this construction project)

 

expected benefit

  • Part of the privately owned vehicles in the Yingge and Fengming area were transferred to Taiwan Railways.
  • Travel time and cost savings.
  • Reduced air pollution and CO2 emissions.

 

Completed and opened to traffic on November 30, 2024.

The origin of the project

  • In order to solve the commuter transportation needs in the metropolitan area, the Ministry of Transportation and Communications instructed the Taiwan Railway Administration to promote the "Taiwan Railway Rapid Transit Systematization". Through the Taiwan Railway's policies such as adding commuter stations and opening commuter trains along the route, it will improve access to mass transit services in metropolitan areas and their surrounding towns. Afterwards, in response to the opening of the high-speed rail, in order to transform the operation mode of the Taiwan Railway and relieve the transfer needs of high-speed rail passengers, and considering that local governments also hope that all metropolitan areas and their surrounding towns can enjoy metropolitan rail transportation services with MRT functions. In July 2003, Taiwan Railway Administration put forward the Evaluation Plan for Taiwan Railways to have MRT functions and to add commuter stations in metropolitan areas. The Fengming Station (North Taoyuan Station) will be merged into the "bottleneck section improvement project" and "addition of simple commuter stations project".
  • After the Executive Yuan held the Feasibility Study and Discussion on Taiwan Railway Adding Fengming Temporary Station meeting on July 23, 2019. Under the conditions of not affecting the future Taoyuan Railway underground project, and not acquiring more land or demolishing more buildings, the project to build a new Fengming temporary station is approved to meet the needs of the public.

 

Project outline

  • Project period: October 2019 to December 2024.【Completed】
  • Project scope: The starting point of the route is about 53K+700, the end point is about 54K+620, and the scheduled mileage of the platform center is about 54K+230.
  • Construction content: Unmanned station is adopted with two side platforms that is 3m in width and 220m in length. Moreover, the rain shelter facilities are added.
  • Program funding: NT$612.68 million.
  • Project location: New Taipei City.
  • Project schematic diagram: (The source of the screenshot is the approved version of this construction project)

 

expected benefit

  • Part of the privately owned vehicles in the Yingge and Fengming area were transferred to Taiwan Railways.
  • Travel time and cost savings.
  • Reduced air pollution and CO2 emissions.

 

Completed and opened to traffic on November 30, 2024.

:::
  • About RB
    • About RB
    • Affiliated Units
  • Railway Construction
    • Project Management
    • en-路網建設
    • en-鐵路立體化建設
    • en-已完成
  • Railway Business
    • Technology Zone
    • Project Management
    • Operation Supervision
    • Railway Industry
    • Station Development
  • Publications
    • Multimedia
    • Newsroom
    • Major Policies
    • Public Information
    • Laws and Regulations
    • Integrity Platform
    • Gender Mainstreaming
  • Service
    • Downloads
    • Employee Services
    • Online Application
  • en-範例
    • en-子選單
  • Privacy Policy  |
  • Information Security Policy  |
  • Open Announcement
logo

Emergency Contact: During Office Hours: (02)8072-3333 | After Hours or Holidays: (02)8969-1601 Railway Bureau, MOTC All Rights Reserved | Tel: (02)8072-3333 | Fax: (02)8969-1567 Address: 9F., No.7, Sec. 2, Xianmin Blvd., Banqiao Dist., New Taipei City 220231, Taiwan (R.O.C.)

Ethics Hotline: (02)8969-1540 | Ethics Fax: (02)8969-1539 Ethics Mailbox: New Taipei City Government Post Office Box 18 Ethics Email: invx@rb.gov.tw Recommended browsers: Chrome, Edge, Safari, Firefox. Screen resolution: 1280 X 810 or higher.

logo