  • Back to Home

  • 中

  • A

  • RSS

Default Logo

  • About RB
    • About RB
      • Director General of RB
      • Organizational Outline of the Railway Bureau
      • Quality policy
      • ISO Area
    • Affiliated Units
      • Northern Engineering
      • Central Engineering
      • Southern Engineering
      • Eastern Engineering
  • Railway Construction
    • Project Management
      • Progress of Projects
    • en-路網建設
      • Double-track Electrification of Railways in Hualien-Taitung Area
      • South Pingtung Tourist Railway Project
      • Airport MRT Extension Line Project
      • Keelung MRT
      • Airport MRT Adding Airport Terminal 3 Station (A14) Project
    • en-鐵路立體化建設
      • Tainan Urban District Railway Underground Project
      • Taiwan Railway Pingzhen Temporary Station Construction Project
      • Taoyuan Metropolitan Area Railway Underground Project
      • Elevated Railway Project at the Urban Area of Chiayi
      • Kaohsiung Urban Railway Underground Project (included Zuoying and Fengshan Project)
      • Taiwan Railway Station Aesthetics and Functional Improvement Project – South Link Station
    • en-已完成
      • Taiwan Railway Fengming Temporary Station Construction Project
      • Taichung Metropolitan Area Elevated Railway Project
      • South-Link Line Railway Electrification Project
      • Hualien-Taitung Line Electrification Project
      • Hualien-Taitung Line Efficiency Improvement Project
      • Taichung Metropolitan MRT System Wuri-Wenxin-Beitun Line Construction Project
      • Access Road to HSR Station Area Project
      • HSR Project
      • Taiwan Taoyuan International Airport Access MRT System Construction Project
  • Railway Business
    • Technology Zone
      • High-Speed Rail Electromechanical System
      • Airport Access MRT System
      • Taiwan Railway System Electromechanical Subsystems
      • Technical Documents
    • Project Management
      • Quality Assurance
      • Occupational Safety and Health
    • Operation Supervision
      • Supervision regulations
      • Operation
      • Safety
      • Inspection
      • Investigation
    • Railway Industry
      • Industry Policies
      • Action Plan
      • Industry Development Subsidy
      • Important Activities and Achievements
      • Contact Information
      • Railway Designated product area
    • Station Development
      • Taiwan High Speed Rail
      • Taoyuan Airport MRT
      • Investment Services
  • Publications
    • Multimedia
    • Newsroom
    • Major Policies
    • Public Information
      • Award Information
      • Awards Area
    • Laws and Regulations
    • Integrity Platform
      • Launching Ceremony
      • Contact Meeting
    • Gender Mainstreaming
  • Service
    • Downloads
      • ISO File Download
    • Employee Services
    • Online Application
      • High-Speed Rail Corridor Cable Trays
      • High-Speed Rail Station External Pre-embedded Pipelines
      • Taiwan Fiber-optic Cable Corridor
  • en-範例
    • en-子選單
      • en-單一文章
      • en-文章列表
      • en-頁籤
      • en-計畫列表
      • en-台灣地圖-圖片
      • en-台灣地圖-MAP
      • en-檔案下載-通用
      • en-檔案下載-法令
      • en-線上申辦
      • en-電子書
:::
Home
Railway Construction
en-鐵路立體化建設
Taiwan Railway Station Aesthetics and Functional Improvement Project – South Link Station

  

Taiwan Railway Station Aesthetics and Functional Improvement Project – South Link Station


4 Phases of Construction
1. Study
2. Design
3. Construction
4. Completion
Plan Status

Planned
10%

Actual
30%

Progress
+20%

Go toCurrent statusCurrent
4. Completion
無內容
View more>>
3. Construction
無內容
View more>>
2. Design
無內容
View more>>
1. Study
無內容
View more>>
Plan Introduction


The origin of the project

The Ministry of Transportation and Communications issued an instruction on August 7, 2019 to launch the "South Link Line Railway Station Efficiency Improvement Plan". It is planned to improve stations and surrounding facilities in 5 years. Considering the c urrent needs, fun ding and other fa ctors, this plan gives priority to the renovation of 9 stations on th e South Link Railway with sightseeing valu e, development potential, and traffic transfer, as well as the aesthetic and functional enhancement of 8 stations on the Western Main Line. In the future, after review the effectiveness of the plan and analyze the possibility of Taiwan Railway stations combined with local characteristics, the aesthetic and functional improvement of Taiwan Railway stations will be ex ecuted in the next stage. Therefore, the railway stations and local
development will share prosperity.

 

Project outline

  • Plan period: January 2021 to December 2025
  • Project scope:
  • A total of 9 stations will be improved at the South Link Line. There are 5 stations in Taitung County including Dawu, Jinlun, Taimali, Zhiben and Kangle, and 4 stations in Pingtung County including Nanzhou, Jiadong, Jialu and Neishi.
  • Construction Content:
  1. Station decoration
  2. Surrounding landscape arrangement
  3. Station landscape facility setting
  4. Art season and curation:through art season and curation activities, create a local circular industrial chain and activate local benefits around the station.
  • Program funding:NT$788.2 million
  • Project location:Taitung County, Pingtung County
  • Project schematic diagram:

 

Expected benefit

The purpose of th is project is to improve th e environment of the South Link Railway Station and surrounding areas, so as to promote local development. Due to the transportation hardware equipment in the eastern region far behind that in the western area, considering from the perspective of public construction, the government shou ld make peopl e recognize and be moved. In addition, the promotion of this plan aims to respond to the public needs, serve local residents along the South Link Railway, optimize the quality of railway services, and thereby promote the development of local settlements.

The origin of the project

The Ministry of Transportation and Communications issued an instruction on August 7, 2019 to launch the "South Link Line Railway Station Efficiency Improvement Plan". It is planned to improve stations and surrounding facilities in 5 years. Considering the c urrent needs, fun ding and other fa ctors, this plan gives priority to the renovation of 9 stations on th e South Link Railway with sightseeing valu e, development potential, and traffic transfer, as well as the aesthetic and functional enhancement of 8 stations on the Western Main Line. In the future, after review the effectiveness of the plan and analyze the possibility of Taiwan Railway stations combined with local characteristics, the aesthetic and functional improvement of Taiwan Railway stations will be ex ecuted in the next stage. Therefore, the railway stations and local
development will share prosperity.

 

Project outline

  • Plan period: January 2021 to December 2025
  • Project scope:
  • A total of 9 stations will be improved at the South Link Line. There are 5 stations in Taitung County including Dawu, Jinlun, Taimali, Zhiben and Kangle, and 4 stations in Pingtung County including Nanzhou, Jiadong, Jialu and Neishi.
  • Construction Content:
  1. Station decoration
  2. Surrounding landscape arrangement
  3. Station landscape facility setting
  4. Art season and curation:through art season and curation activities, create a local circular industrial chain and activate local benefits around the station.
  • Program funding:NT$788.2 million
  • Project location:Taitung County, Pingtung County
  • Project schematic diagram:

 

Expected benefit

The purpose of th is project is to improve th e environment of the South Link Railway Station and surrounding areas, so as to promote local development. Due to the transportation hardware equipment in the eastern region far behind that in the western area, considering from the perspective of public construction, the government shou ld make peopl e recognize and be moved. In addition, the promotion of this plan aims to respond to the public needs, serve local residents along the South Link Railway, optimize the quality of railway services, and thereby promote the development of local settlements.

:::
  • About RB
    • About RB
    • Affiliated Units
  • Railway Construction
    • Project Management
    • en-路網建設
    • en-鐵路立體化建設
    • en-已完成
  • Railway Business
    • Technology Zone
    • Project Management
    • Operation Supervision
    • Railway Industry
    • Station Development
  • Publications
    • Multimedia
    • Newsroom
    • Major Policies
    • Public Information
    • Laws and Regulations
    • Integrity Platform
    • Gender Mainstreaming
  • Service
    • Downloads
    • Employee Services
    • Online Application
  • en-範例
    • en-子選單
  • Privacy Policy  |
  • Information Security Policy  |
  • Open Announcement
logo

Emergency Contact: During Office Hours: (02)8072-3333 | After Hours or Holidays: (02)8969-1601 Railway Bureau, MOTC All Rights Reserved | Tel: (02)8072-3333 | Fax: (02)8969-1567 Address: 9F., No.7, Sec. 2, Xianmin Blvd., Banqiao Dist., New Taipei City 220231, Taiwan (R.O.C.)

Ethics Hotline: (02)8969-1540 | Ethics Fax: (02)8969-1539 Ethics Mailbox: New Taipei City Government Post Office Box 18 Ethics Email: invx@rb.gov.tw Recommended browsers: Chrome, Edge, Safari, Firefox. Screen resolution: 1280 X 810 or higher.

logo