  • Back to Home

  • 中

  • A

  • RSS

Default Logo

  • About RB
    • About RB
      • Director General of RB
      • Organizational Outline of the Railway Bureau
      • Quality policy
      • ISO Area
    • Affiliated Units
      • Northern Engineering
      • Central Engineering
      • Southern Engineering
      • Eastern Engineering
  • Railway Construction
    • Project Management
      • Progress of Projects
    • en-路網建設
      • Double-track Electrification of Railways in Hualien-Taitung Area
      • South Pingtung Tourist Railway Project
      • Airport MRT Extension Line Project
      • Keelung MRT
      • Airport MRT Adding Airport Terminal 3 Station (A14) Project
    • en-鐵路立體化建設
      • Tainan Urban District Railway Underground Project
      • Taiwan Railway Pingzhen Temporary Station Construction Project
      • Taoyuan Metropolitan Area Railway Underground Project
      • Elevated Railway Project at the Urban Area of Chiayi
      • Kaohsiung Urban Railway Underground Project (included Zuoying and Fengshan Project)
      • Taiwan Railway Station Aesthetics and Functional Improvement Project – South Link Station
    • en-已完成
      • Taiwan Railway Fengming Temporary Station Construction Project
      • Taichung Metropolitan Area Elevated Railway Project
      • South-Link Line Railway Electrification Project
      • Hualien-Taitung Line Electrification Project
      • Hualien-Taitung Line Efficiency Improvement Project
      • Taichung Metropolitan MRT System Wuri-Wenxin-Beitun Line Construction Project
      • Access Road to HSR Station Area Project
      • HSR Project
      • Taiwan Taoyuan International Airport Access MRT System Construction Project
  • Railway Business
    • Technology Zone
      • High-Speed Rail Electromechanical System
      • Airport Access MRT System
      • Taiwan Railway System Electromechanical Subsystems
      • Technical Documents
    • Project Management
      • Quality Assurance
      • Occupational Safety and Health
    • Operation Supervision
      • Supervision regulations
      • Operation
      • Safety
      • Inspection
      • Investigation
    • Railway Industry
      • Industry Policies
      • Action Plan
      • Industry Development Subsidy
      • Important Activities and Achievements
      • Contact Information
      • Railway Designated product area
    • Station Development
      • Taiwan High Speed Rail
      • Taoyuan Airport MRT
      • Investment Services
  • Publications
    • Multimedia
    • Newsroom
    • Major Policies
    • Public Information
      • Award Information
      • Awards Area
    • Laws and Regulations
    • Integrity Platform
      • Launching Ceremony
      • Contact Meeting
    • Gender Mainstreaming
  • Service
    • Downloads
      • ISO File Download
    • Employee Services
    • Online Application
      • High-Speed Rail Corridor Cable Trays
      • High-Speed Rail Station External Pre-embedded Pipelines
      • Taiwan Fiber-optic Cable Corridor
  • en-範例
    • en-子選單
      • en-單一文章
      • en-文章列表
      • en-頁籤
      • en-計畫列表
      • en-台灣地圖-圖片
      • en-台灣地圖-MAP
      • en-檔案下載-通用
      • en-檔案下載-法令
      • en-線上申辦
      • en-電子書
:::
Home
Railway Construction
en-鐵路立體化建設
Tainan Urban District Railway Underground Project

  

Tainan Urban District Railway Underground Project


4 Phases of Construction
1. Study
2. Design
3. Construction
4. Completion
Plan Status

Planned
10%

Actual
30%

Progress
+20%

Go toCurrent statusCurrent
4. Completion
無內容
View more>>
3. Construction
無內容
View more>>
2. Design
無內容
View more>>
1. Study
無內容
View more>>
Plan Introduction


The Tainan Urban District Railway Underground Project was approved by the Executive Yuan on September 9, 2009 as part of the TRA Rapid Transit Systematization in the Metropolitan Areas Project. The project is designed to meet urban renewal needs in the Tainan Station area, integrate city transportation systems, and provide a more convenient and modern transportation system. The project duration starts from September, 2009 to November 2026 and  the total cost is NT$33.67 billion. 

The Tainan Project involves the construction of an 8.23-kilometer-long underground rail line from the south end of the Zhonghua Land Bridge (Yongkang Bridge) to the south end of Shengchan Road. The old Tainan Station building was preserved as a historic site. The new Tainan Station was established along with two new commuter stations—Linsen and South Tainan. The project eliminates nine railway crossings and four underpasses.

 

On April 16, 2025, the Executive Yuan approved the third Revised Project Report, with the completion date extended to March 2031 and the total budget increased to NT$41.2643 billion.

 

 

The schematic diagram of Tainan Urban District Railway Underground Project

The Tainan Urban District Railway Underground Project was approved by the Executive Yuan on September 9, 2009 as part of the TRA Rapid Transit Systematization in the Metropolitan Areas Project. The project is designed to meet urban renewal needs in the Tainan Station area, integrate city transportation systems, and provide a more convenient and modern transportation system. The project duration starts from September, 2009 to November 2026 and  the total cost is NT$33.67 billion. 

The Tainan Project involves the construction of an 8.23-kilometer-long underground rail line from the south end of the Zhonghua Land Bridge (Yongkang Bridge) to the south end of Shengchan Road. The old Tainan Station building was preserved as a historic site. The new Tainan Station was established along with two new commuter stations—Linsen and South Tainan. The project eliminates nine railway crossings and four underpasses.

 

On April 16, 2025, the Executive Yuan approved the third Revised Project Report, with the completion date extended to March 2031 and the total budget increased to NT$41.2643 billion.

 

 

The schematic diagram of Tainan Urban District Railway Underground Project

:::
  • About RB
    • About RB
    • Affiliated Units
  • Railway Construction
    • Project Management
    • en-路網建設
    • en-鐵路立體化建設
    • en-已完成
  • Railway Business
    • Technology Zone
    • Project Management
    • Operation Supervision
    • Railway Industry
    • Station Development
  • Publications
    • Multimedia
    • Newsroom
    • Major Policies
    • Public Information
    • Laws and Regulations
    • Integrity Platform
    • Gender Mainstreaming
  • Service
    • Downloads
    • Employee Services
    • Online Application
  • en-範例
    • en-子選單
  • Privacy Policy  |
  • Information Security Policy  |
  • Open Announcement
logo

Emergency Contact: During Office Hours: (02)8072-3333 | After Hours or Holidays: (02)8969-1601 Railway Bureau, MOTC All Rights Reserved | Tel: (02)8072-3333 | Fax: (02)8969-1567 Address: 9F., No.7, Sec. 2, Xianmin Blvd., Banqiao Dist., New Taipei City 220231, Taiwan (R.O.C.)

Ethics Hotline: (02)8969-1540 | Ethics Fax: (02)8969-1539 Ethics Mailbox: New Taipei City Government Post Office Box 18 Ethics Email: invx@rb.gov.tw Recommended browsers: Chrome, Edge, Safari, Firefox. Screen resolution: 1280 X 810 or higher.

logo