      • Double-track Electrification of Railways in Hualien-Taitung Area
      • South Pingtung Tourist Railway Project
      • Airport MRT Extension Line Project
      • Keelung MRT
      • Airport MRT Adding Airport Terminal 3 Station (A14) Project
    • en-鐵路立體化建設
      • Tainan Urban District Railway Underground Project
      • Taiwan Railway Pingzhen Temporary Station Construction Project
      • Taoyuan Metropolitan Area Railway Underground Project
      • Elevated Railway Project at the Urban Area of Chiayi
      • Kaohsiung Urban Railway Underground Project (included Zuoying and Fengshan Project)
      • Taiwan Railway Station Aesthetics and Functional Improvement Project – South Link Station
    • en-已完成
      • Taiwan Railway Fengming Temporary Station Construction Project
      • Taichung Metropolitan Area Elevated Railway Project
      • South-Link Line Railway Electrification Project
      • Hualien-Taitung Line Electrification Project
      • Hualien-Taitung Line Efficiency Improvement Project
      • Taichung Metropolitan MRT System Wuri-Wenxin-Beitun Line Construction Project
      • Access Road to HSR Station Area Project
      • HSR Project
      • Taiwan Taoyuan International Airport Access MRT System Construction Project
  • Railway Business
    • Technology Zone
      • High-Speed Rail Electromechanical System
      • Airport Access MRT System
      • Taiwan Railway System Electromechanical Subsystems
      • Technical Documents
    • Project Management
      • Quality Assurance
      • Occupational Safety and Health
    • Operation Supervision
      • Supervision regulations
      • Operation
      • Safety
      • Inspection
      • Investigation
    • Railway Industry
      • Industry Policies
      • Action Plan
      • Industry Development Subsidy
      • Important Activities and Achievements
      • Contact Information
      • Railway Designated product area
    • Station Development
      • Taiwan High Speed Rail
      • Taoyuan Airport MRT
      • Investment Services
  • Publications
    • Multimedia
    • Newsroom
    • Major Policies
    • Public Information
      • Award Information
      • Awards Area
    • Laws and Regulations
    • Integrity Platform
      • Launching Ceremony
      • Contact Meeting
    • Gender Mainstreaming
  • Service
    • Downloads
      • ISO File Download
    • Employee Services
    • Online Application
      • High-Speed Rail Corridor Cable Trays
      • High-Speed Rail Station External Pre-embedded Pipelines
      • Taiwan Fiber-optic Cable Corridor
  • en-範例
    • en-子選單
      • en-單一文章
      • en-文章列表
      • en-頁籤
      • en-計畫列表
      • en-台灣地圖-圖片
      • en-台灣地圖-MAP
      • en-檔案下載-通用
      • en-檔案下載-法令
      • en-線上申辦
      • en-電子書
:::
Home
Railway Construction
en-鐵路立體化建設
Taoyuan Metropolitan Area Railway Underground Project

  

Taoyuan Metropolitan Area Railway Underground Project


4 Phases of Construction
1. Study
2. Design
3. Construction
4. Completion
Plan Status

Planned
1%

Actual
10%

Progress
+9%

Go toCurrent statusCurrent
4. Completion
無內容
View more>>
3. Construction
無內容
View more>>
2. Design
無內容
View more>>
1. Study
無內容
View more>>
Plan Introduction


The origin of the project

Due to the rapid development of the Taoyuan metropolitan area, the number of passengers traveling by railway has grown rapidly, and the travel service facilities have been insufficient. For a long time, the Taoyuan City Government and local people have been actively striving to make the Taoyuan section railway elevated. Approved by Executive Yuan on February 27, 2009, the Elevated Construction of the Taoyuan Section of the Taiwan Railway were implemented. (Letter No. 0980008165)
Later, because the Taoyuan City Government considered that the width of the railway corridor in the Taoyuan section was insufficient, the elevated railway would have a great impact on the landscape and produce noise along the Taoyuan and Zhongli metropolitan areas. Moreover, the population is dense along the route, and the passenger volume of Taoyuan Station and Zhongli Station is second only to Taipei Station, making them the busiest transportation hub in Taiwan. At the same time, Taoyuan City is a national gateway and has been upgraded to a municipality. Considering the macro and sustainable development and responding to the needs of local people, the Executive Yuan approved to implement the underground construction of the Taoyuan Section of the Taiwan Railway on September 2, 2020 (Letter No. 1090024447).

 

Project outline

  • Project period: September 2020 to December 2030.
  • Project scope: The route starts from the north side of the Fengming Bridge(K53+255) in Yingge District and ends near Highway Line 66 (K71+200) in Pingzhen District. The total length is about 17.945 km, of which the Xinbei Fengming section is about 2.120 km long and the Taoyuan section is about 15.825 km long.
  • Construction content: 8 underground stations, which are 3 rebuild stations including Taoyuan, Neili and Zhongli, and 5 new commuter stations including Fengming Station, Zhonglu Station, Taoyuan Hospital Station, Zhongyuan Station and Pingzhen Station.
  • Program funding: NT$104.793 billion.
  • Project location: New Taipei City and Taoyuan City.
  • Project schematic diagram:

 

expected benefit

  • Dismantle 8 viaducts and 8 underpasses, eliminate 20 level crossings and integrate related railway systems to form the backbone of commuting in Taipei City, New Taipei City, and Taoyuan City, which will help improve the urban landscape and land utilization, and form an one hour track life circle in Green Transport Corridor.
  • Improve operation efficiency and route capacity, and enhance the quality of public transport services in metropolitan areas.
  • Effective land utilization along the route and promote balanced urban development.
  • Increase railway revenue and improve operation safety.

The origin of the project

Due to the rapid development of the Taoyuan metropolitan area, the number of passengers traveling by railway has grown rapidly, and the travel service facilities have been insufficient. For a long time, the Taoyuan City Government and local people have been actively striving to make the Taoyuan section railway elevated. Approved by Executive Yuan on February 27, 2009, the Elevated Construction of the Taoyuan Section of the Taiwan Railway were implemented. (Letter No. 0980008165)
Later, because the Taoyuan City Government considered that the width of the railway corridor in the Taoyuan section was insufficient, the elevated railway would have a great impact on the landscape and produce noise along the Taoyuan and Zhongli metropolitan areas. Moreover, the population is dense along the route, and the passenger volume of Taoyuan Station and Zhongli Station is second only to Taipei Station, making them the busiest transportation hub in Taiwan. At the same time, Taoyuan City is a national gateway and has been upgraded to a municipality. Considering the macro and sustainable development and responding to the needs of local people, the Executive Yuan approved to implement the underground construction of the Taoyuan Section of the Taiwan Railway on September 2, 2020 (Letter No. 1090024447).

 

Project outline

  • Project period: September 2020 to December 2030.
  • Project scope: The route starts from the north side of the Fengming Bridge(K53+255) in Yingge District and ends near Highway Line 66 (K71+200) in Pingzhen District. The total length is about 17.945 km, of which the Xinbei Fengming section is about 2.120 km long and the Taoyuan section is about 15.825 km long.
  • Construction content: 8 underground stations, which are 3 rebuild stations including Taoyuan, Neili and Zhongli, and 5 new commuter stations including Fengming Station, Zhonglu Station, Taoyuan Hospital Station, Zhongyuan Station and Pingzhen Station.
  • Program funding: NT$104.793 billion.
  • Project location: New Taipei City and Taoyuan City.
  • Project schematic diagram:

 

expected benefit

  • Dismantle 8 viaducts and 8 underpasses, eliminate 20 level crossings and integrate related railway systems to form the backbone of commuting in Taipei City, New Taipei City, and Taoyuan City, which will help improve the urban landscape and land utilization, and form an one hour track life circle in Green Transport Corridor.
  • Improve operation efficiency and route capacity, and enhance the quality of public transport services in metropolitan areas.
  • Effective land utilization along the route and promote balanced urban development.
  • Increase railway revenue and improve operation safety.
:::
  • About RB
    • About RB
    • Affiliated Units
  • Railway Construction
    • Project Management
    • en-路網建設
    • en-鐵路立體化建設
    • en-已完成
  • Railway Business
    • Technology Zone
    • Project Management
    • Operation Supervision
    • Railway Industry
    • Station Development
  • Publications
    • Multimedia
    • Newsroom
    • Major Policies
    • Public Information
    • Laws and Regulations
    • Integrity Platform
    • Gender Mainstreaming
  • Service
    • Downloads
    • Employee Services
    • Online Application
  • en-範例
    • en-子選單
  • Privacy Policy  |
  • Information Security Policy  |
  • Open Announcement
logo

Emergency Contact: During Office Hours: (02)8072-3333 | After Hours or Holidays: (02)8969-1601 Railway Bureau, MOTC All Rights Reserved | Tel: (02)8072-3333 | Fax: (02)8969-1567 Address: 9F., No.7, Sec. 2, Xianmin Blvd., Banqiao Dist., New Taipei City 220231, Taiwan (R.O.C.)

Ethics Hotline: (02)8969-1540 | Ethics Fax: (02)8969-1539 Ethics Mailbox: New Taipei City Government Post Office Box 18 Ethics Email: invx@rb.gov.tw Recommended browsers: Chrome, Edge, Safari, Firefox. Screen resolution: 1280 X 810 or higher.

logo