• :::
  • Back to Home

  • 中

  • A

  • RSS

Default Logo

  • About RB
    • About RB
      • Director General of RB
      • Organizational Outline of the Railway Bureau
      • Quality policy
      • ISO Area
    • Affiliated Units
      • Northern Engineering
      • Central Engineering
      • Southern Engineering
      • Eastern Engineering
  • Railway Construction
    • Project Management
      • Progress of Projects
    • en-路網建設
      • Double-track Electrification of Railways in Hualien-Taitung Area
      • South Pingtung Tourist Railway Project
      • Airport MRT Extension Line Project
      • Keelung MRT
      • Airport MRT Adding Airport Terminal 3 Station (A14) Project
    • en-鐵路立體化建設
      • Tainan Urban District Railway Underground Project
      • Taiwan Railway Pingzhen Temporary Station Construction Project
      • Taoyuan Metropolitan Area Railway Underground Project
      • Elevated Railway Project at the Urban Area of Chiayi
      • Kaohsiung Urban Railway Underground Project (included Zuoying and Fengshan Project)
      • Taiwan Railway Station Aesthetics and Functional Improvement Project – South Link Station
    • en-已完成
      • Taiwan Railway Fengming Temporary Station Construction Project
      • Taichung Metropolitan Area Elevated Railway Project
      • South-Link Line Railway Electrification Project
      • Hualien-Taitung Line Electrification Project
      • Hualien-Taitung Line Efficiency Improvement Project
      • Taichung Metropolitan MRT System Wuri-Wenxin-Beitun Line Construction Project
      • Access Road to HSR Station Area Project
      • HSR Project
      • Taiwan Taoyuan International Airport Access MRT System Construction Project
  • Railway Business
    • Technology Zone
      • High-Speed Rail Electromechanical System
      • Airport Access MRT System
      • Taiwan Railway System Electromechanical Subsystems
      • Technical Documents
    • Project Management
      • Quality Assurance
      • Occupational Safety and Health
    • Operation Supervision
      • Supervision regulations
      • Operation
      • Safety
      • Inspection
      • Investigation
    • Railway Industry
      • Industry Policies
      • Action Plan
      • Industry Development Subsidy
      • Important Activities and Achievements
      • Contact Information
      • Railway Designated product area
    • Station Development
      • Taiwan High Speed Rail
      • Taoyuan Airport MRT
      • Investment Services
  • Publications
    • Multimedia
    • Newsroom
    • Major Policies
    • Public Information
      • Award Information
      • Awards Area
    • Laws and Regulations
    • Integrity Platform
      • Launching Ceremony
      • Contact Meeting
    • Gender Mainstreaming
  • Service
    • Downloads
      • ISO File Download
    • Employee Services
    • Online Application
      • High-Speed Rail Corridor Cable Trays
      • High-Speed Rail Station External Pre-embedded Pipelines
      • Taiwan Fiber-optic Cable Corridor
  • en-範例
    • en-子選單
      • en-單一文章
      • en-文章列表
      • en-頁籤
      • en-計畫列表
      • en-台灣地圖-圖片
      • en-台灣地圖-MAP
      • en-檔案下載-通用
      • en-檔案下載-法令
      • en-線上申辦
      • en-電子書
:::
Home
About RB
About RB
Organizational Outline of the Railway Bureau

  

Organizational Outline of the Railway Bureau


Organization Outline

There are 6 business divisions in the RB including Planning, Civil and Architectural Engineering, Electrical and Mechanical Technology, Engineering Management, Operation Supervision, and Assets Management and Development Divisions. The scope of work includes planning and project review of railway, MRT and other railway transportation systems, establishing technical specifications, railway industries, land development of station districts and promoting railway supervision operations. In addition, 6 administrative support units including Information Management, Legal Affairs, Secretariat, Personnel, Civil Service Ethics and Accounting and Statistics Offices are established. Northern, Central, Southern and Eastern Region Engineering Branch Offices are implementing engineering constructions and relevant operations regarding all railway transportation projects.

 

Functions of the Railway Bureau

 

Unit Responsibilities
Planning Division The project planning, operation and financial planning, technology development and exchange and international collaboration or export, private participation planning and environment protection in relation to railway systems.
Civil and Architectural Engineering Division The planning, review and supervision of every railway system’s civil, structural, railway track, architectural, landscape, soil and water conservation, hydroelectricity and environment control, climate-change adaptation, and other engineering.
Electrical and Mechanical Technology Division The planning, review and supervision of every railway system’s power, signaling, telecommunications, vehicles, depot maintenance and repair facilities, digital applications, and railway industry.
Engineering Management Division The planning of railway systems’ regulations on systematic integration, contract management, engineering management, quality control, occupational safety and health, as well as technological specifications.
Operation Supervision Division The supervision and management of each railway system’s operation, operation status, traffic, operation personnel, transportation of passenger/freight, route construction and maintenance, locomotive inspection and repair, safety management, accident investigation and disaster prevention and response.
Assets Management and Development Division The land planning, land acquisition, and the right of way management, land development, operation management, assets and disposition and related affairs for high speed rails, mass rapid transits and light rail transit system.
Region Engineering Branch Offices
  1. The planning, review, control, land acquisition, and property transfer of railway engineering projects.
  2. The construction, supervising, acceptance, and material testing of railway civil engineering, including bridges, tunnels, routes, tracks, architecture, and so on.
  3. The construction, supervision, acceptance, and material testing of railway core E&M system engineering, including power supply, telecommunications, signaling, rolling stocks, depot equipment/ facilities, and SCADA.
  4. he construction, supervision, acceptance, and material testing of railway E&M engineering, including water/electricity, environmental control, fire fighting, elevators/escalators.
  5. The procurement, contract management, and dispute settlement of railway engineering.
  6. The allocation, storage/transportation, and management of railway engineering construction equipment.
  7. The traffic maintenance coordination of railway trains and freeway buses during railway engineering construction.
  8. The inspection and supervision of occupational safety and health, disaster prevention, environmental protection and soil/water conservation of railway engineering.
  9. Other related work of railway engineering.

Publish Date:

114-07-16

Maintenance Unit:

人事室

Last Update Date:

114-07-16

< Back

Thank you for using this service. Your satisfaction is our motivation. We welcome you to fill out the satisfaction feedback form for the presentation of this webpage. Your valuable feedback will help us improve our service quality.
*How many points do you give to the presentation of this webpage?
Please click the stars above to provide a rating

Your suggestions for the presentation of this webpage:※ Limit to 1000 characters
If you have any suggestions or areas that need improvement for TRA services, please leave a message at the "Director's Mailbox", and we will handle it carefully as soon as possible.
*Verification codeverification code  
  
:::
  • About RB
    • About RB
    • Affiliated Units
  • Railway Construction
    • Project Management
    • en-路網建設
    • en-鐵路立體化建設
    • en-已完成
  • Railway Business
    • Technology Zone
    • Project Management
    • Operation Supervision
    • Railway Industry
    • Station Development
  • Publications
    • Multimedia
    • Newsroom
    • Major Policies
    • Public Information
    • Laws and Regulations
    • Integrity Platform
    • Gender Mainstreaming
  • Service
    • Downloads
    • Employee Services
    • Online Application
  • en-範例
    • en-子選單
  • Privacy Policy  |
  • Information Security Policy  |
  • Open Announcement
logo

Emergency Contact: During Office Hours: (02)8072-3333 | After Hours or Holidays: (02)8969-1601 Railway Bureau, MOTC All Rights Reserved | Tel: (02)8072-3333 | Fax: (02)8969-1567 Address: 9F., No.7, Sec. 2, Xianmin Blvd., Banqiao Dist., New Taipei City 220231, Taiwan (R.O.C.)

Ethics Hotline: (02)8969-1540 | Ethics Fax: (02)8969-1539 Ethics Mailbox: New Taipei City Government Post Office Box 18 Ethics Email: invx@rb.gov.tw Recommended browsers: Chrome, Edge, Safari, Firefox. Screen resolution: 1280 X 810 or higher.

logo